Guide · Updated July 2026
Tender response checklist: run this before you submit
Forty checks across five stages. Most losing bids fail something on this list rather than losing on merit.
The gap between a bid that scores well and one that is set aside is usually not capability. It is whether someone systematically checked the submission before it went in. This checklist is that check.
Work through it in the final 48 hours, not the final two. Several items require someone else's time — a director's signature, a broker's certificate, a referee's confirmation — and those cannot be compressed.
Stage 1: Mandatory compliance
Clear these first. A failure here means the bid is non-conforming and will not be scored, so nothing else matters until they are all confirmed.
- Every mandatory requirement in your compliance matrix is marked complete
- Public liability insurance meets or exceeds the specified limit
- Professional indemnity held where required by scope
- Workers compensation certificate current, and for the correct jurisdiction
- All certificates of currency valid at the submission date, not expiring imminently
- The insured entity name exactly matches the bidding entity
- Trade or contractor licence is the correct class for the scope described
- Licence held in the state where the work will be performed
- Any financial category cap on your licence exceeds the contract value
- Prequalification current, at the required category and value band
- Scope accreditations attached — backflow, TMV, CEC, traffic management, asbestos as applicable
- Personnel screening evidenced for the site types involved
- Mandatory briefing or site inspection was attended, with proof
- ABN active and entity details on the register match your submission
If any insurance or licence item fails, talk to your broker or the licensing body immediately — some can be resolved in days. See insurance requirements and ABNs and licences.
Stage 2: Content and criteria
- Every evaluation criterion has a corresponding response section
- Section headings mirror the criteria wording and order
- Each sub-part of each criterion is separately addressed
- Each response answers the question actually asked, not an adjacent topic
- Every claim carries a number, date, volume or verifiable fact
- Responses reference this contract's specific sites, volumes and constraints
- Past performance projects are genuinely comparable in client type, scope, scale and complexity
- Referees have been contacted and confirmed they are willing and available
- Risks are named honestly with mitigations, not dismissed
- No generic or recycled methodology referencing constraints that do not apply
- Buyer's terminology used throughout rather than your internal terms
- Someone other than the author has scored it against the criteria and found nothing missing
That last item is the highest-value check on this page. The author cannot see gaps because they know what they meant. See tender writing tips for the underlying technique.
Stage 3: Pricing
- Pricing submitted in the buyer's mandated format and template
- Every line of the pricing schedule completed — no blanks, no "TBC"
- GST treatment matches what the schedule requests
- Arithmetic checked independently, including totals and rate extensions
- Labour priced against correct award classifications and penalty rates
- All on-costs included — superannuation, leave, workers comp premium, payroll tax
- Travel, mobilisation and site access constraints allowed for
- Overheads and margin genuinely recovered, not assumed
- Rate escalation addressed for multi-year terms, or the absence of it accepted deliberately
- Contractual risk from the draft contract priced — liquidated damages, indemnities, payment terms
Pricing schedule format errors are particularly damaging because they can render your price non-comparable. Method is in how to price a tender.
Stage 4: Format and attachments
- Within the page limit — content beyond it is generally disregarded
- Required response template used, unmodified in structure
- Font size and formatting requirements met
- Correct file format — PDF where specified rather than Word
- Documents submitted separately where separate uploads are required
- All attachments present, clearly labelled, and referenced from the response body
- File names are professional and identify your business and the tender
- Total file size within portal limits
- All declarations signed by a person with authority to bind the entity
- Wet signature used where a scanned signature is not accepted
- No blank pages, no tracked changes, no internal comments left in
- No placeholder text — search for "TBC", "insert", "XXX" and the previous client's name
That final search catches the most embarrassing error in tendering: a recycled response naming a different agency.
Stage 5: Submission
- Complete draft uploaded at least 48 hours before close
- Portal confirmed it accepted every file
- Submission receipt or confirmation saved
- Deadline time zone confirmed — a Perth close time is not an eastern states close time
- Final version replaced any earlier draft, and the correct version is the live one
- A copy of exactly what was submitted retained for your records
Uploading early converts an absolute deadline into a soft one, since most portals allow resubmission until close. It eliminates the single most common cause of bid failure — see why tenders get rejected.
After submission
Diarise the expected award date. When the outcome arrives, request a debrief whether you won or lost, using the questions in tender debrief questions. Then log what you learned so the next bid starts ahead.
Keep the pipeline moving while you wait — browse live opportunities on our tender feeds, by state such as NSW or sector such as construction and cleaning. And before committing to the next one, run the bid/no-bid scorecard.
Frequently asked questions
When should I start working through this checklist?
Begin the compliance stage on day one of the tender period, because insurance limits, licences and prequalification cannot be fixed quickly. The content, pricing and format stages belong in the final week, with submission completed 48 hours before close.
What is the most commonly missed item?
Signatures on declarations, closely followed by insurance limits. Both depend on someone else's availability, which is why they should be identified early and assigned an owner rather than left to the final assembly.
Do I really need someone else to review the response?
Yes, and it should be a scoring exercise rather than a proofread. Give them the evaluation criteria and ask them to find the evidence for each one. Anything they cannot locate is a gap, because an evaluator will not find it either.
Is it risky to submit 48 hours early?
No. Most Australian government portals allow you to replace documents until the deadline, so an early submission is a safety net rather than a commitment. The genuine risk lies in leaving upload until the final hour when file sizes, connections and portal load all become problems.
What if I find a compliance failure the day before close?
Assess whether it is genuinely fixable — insurance limits sometimes are within a day, licences generally are not. If it cannot be remedied, submitting a non-conforming bid wastes the effort since it will not be scored. Redirect to the next opportunity and record the lesson.